4.04 - Implement Geometry & Timings
Implement geometry set is critical for the correct operation of the GPS and Sectional Control features of the seeding system.
When using Sectional Control, it is important to enter the correct product timing from the manifold valve to the opener. Confirm the timing and hose routing by performing an ASC Setup & Timings test.
IMPORTANT - Developing ASC Timings is critical for accurate on / off times for seed and fertilizer and to verify correct hose routing from the manifold valves to the drill.
Implement Geometry
Implement Geometry Op Man - Operator's manual pages for the settings for the Geometry tab
Implement Geometry - Step by step PDF with screen shots for the Geometry tab
Implement Geometry & Timings
Implement geometry set is critical for the correct operation of the GPS and Sectional Control features of the seeding system.
When using Sectional Control, it is important to enter the correct product timing from the manifold valve to the opener. Verify the timings and hose routing by conducting an ASC Timings test in the field.
ASC Timings
Timings Op Man - Operator's manual pages for the settings for the Section Control tab
Timing - Step by step PDF with screen shots for the Section Control tab
ASC Timing Quick Reference Guide - Quick Reference Guide to be used for setting up ASC timings
Bourgault Auto Section Control - Setup & Timings Update
The Bourgault ASC option provides the best returns for farmers when sequence timings have been collected and entered in the X30 controller. One enhancement of the X30 software released with v3.18 is on-time and off-time setting per section.
Dual Boom ASC Setup
Dual Boom ASC Setup - Step by step PDF with screen shots for setting up Dual Boom ASC